12/3/2023 0 Comments Parkdale elementary gym fireplace![]() Replace the existing phone system school with a new VOIP system to include phones in every classroom. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. Replace the existing phone system at Crisfield High school with a new VOIP system to include phones in every classroom. The work will include demolition of the exterior skin and cavity interstitial materials and replacement with new materials. To address water infiltration thru the falling masonry assemblies. Replace the intercom head end equipment, administration desk units, and rewire the equipment into the existing system. Replace the intercom head end equipment, administration desk units, and rewire head end into existing system. Learning Excellence-Effective Communication. Replace the 24 year old domestic water heater system with two-100 gallons new water heaters. Parkdale Elementary 141 Girard Avenue East Aurora, NY 14052 Phone (716) 687-2352 Fax (716) 687-2350. Replace the manually operated wooden bleachers. Repair and resurface asphalt surface and line painting/marking. Resurface the 27 year old original asphalt surface and line painting, project areas includes driveways, bus loop, parking and play areas. According to state test scores, 47 of students are at least proficient in math and 52 in reading. It has 264 students in grades K-5 with a student-teacher ratio of 16 to 1. Replace the malfunctioning 10T Trash compactor. Parkdale Elementary School is an above average, public school located in PARKDALE, OR. Replacement of the 10T trash compactor that was originally installed in 1989. Install a new cctv and video surveillance system. This hallway extension will connect two existing hallways thus increasing student safety and security of the building. Healthy debates are natural, but kindness is required. Then replace with new VCT flooring.Ĭurrently some students have to go outside in order to access two classrooms. Were all in this together to create a welcoming environment. school year.8 A fire destroyed the building the day after commencement in June. Remove the carpet, fritz tile, and VCT flooring. both the east and west sides it also expanded the gymnasium space on the. Installation of a system-wide standard Life Safety Communications System Replace concrete sidewalks and repave parking lots. ![]() Sidewalk Replacement & Parking Lot Repavement Mergenthaler Vocational-Technical High #410 Replace Sidewalk, concrete apron, dumpster pad, curb, gutter and knee wall in parking lot. Sidewalk Replacement and Concrete Fixtures The request is to replace the Elevator (AA1524 or Elevator "A") Installation of network integrated access control on all primary perimeter entry/exit points used by students, teachers and staff and the public.Ĭoating of the parking lot & fixing cracks. Replace the manual stage folding partition. Replace the twenty-one year old PA system Sand and refinish the Main Gym Floor and the Auxiliary Gym Floor.Īdd a Power Conditioning Panel to balance the electrical usage and be compatible with the Local Utility Agency (SMECO). Replacement of the schools fire alarm system.Īdd Above Ground Storage Tank for Boiler Operation. Replacement of VCT gym floor with RobinWood Sport Wood Flooring System. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |